Project "EE " For Evil Elvis. September 8, 2009 We have been busy working on the V8 Swap. The engine is a 350 crate motor with a few upgrades. The trans is a Turbo 350. As you can see we have fabricated the engine and trans mounts and modified the firewall. Next step is to shorten the GM shifter steering column and hook it up to the Mustang II rack. I've welded and sealed the floor board patches and applied Dynamat all of the way to the inside top of the dash. The new electric wiper motor is in and wired up. The new wiring harness is mounted and ready to have the wires run. All of the work has been done by myself and my buddy Tony at his shop. |